Design of a constructed wetland system for treatment of copper-contaminated wastewater
George M. Huddleston, III1 and
John H. Rodgers, Jr.2
1 ENTRIX, Inc., 102 East Main Street, Pendleton, South Carolina 29670; mhuddleston{at}entrix.com
2 Department of Forestry and Natural Resources, Clemson University, Clemson, South Carolina 29634; jrodger{at}clemson.edu
George M. Huddleston is project scientist at ENTRIX, Inc., and has 9 years of professional experience involving environmental toxicology and ecological risk management. He specializes in assessment of natural resources and development of strategies for mitigating ecological risks. He received his B.S. and M.S. degrees from Eastern Kentucky University and received his Ph.D. in 2001 from Clemson University.
John Rodgers received his Ph.D. from Virginia Polytechnic Institute and State University in 1977. Currently, he is a professor at Clemson University, director of the Ecotoxicology Program in the Department of Forestry and Natural Resources, and codirector of the Clemson Environmental Institute. His research involves a quest for accurate risk characterizations and development of sustainable risk mitigation tactics.
This research provided an approach for designing a constructed wetland system for treatment of copper-contaminated wastewater and was mostly based on (1) a review of scientific literature, (2) theoretical modeling, and (3) verification of performance via a pilot system. The pilot system consisted of five pairs of 378-L (100-gal) wetland cells, each pair arranged in series with a 48-hr hydraulic retention time. Four pairs received local municipal water amended with 50 µg Cu/L (nominal) as CuSO4·5H2O. The remaining pair received only municipal water, which provided an untreated control. Wetland hydrosoil was 85% sand and 15% silt and clay-size particles amended with agricultural lime (CaCO3), gypsum (CaSO4·2H2O), and Osmocote time-release fertilizer. Organic matter content was 3% by weight. Hydrosoil and overlying water depths were 30 cm (12 in.) each. Wetland vegetation was Schoenoplectus californicus (giant bulrush). Performance objectives were to decrease total copper to less than 22 µg/L and to eliminate toxicity to Ceriodaphnia dubia based on organism survival and reproduction. Total (acid-soluble) copper concentrations associated with wetland inflow averaged 46 ± 9 µg/L, whereas outflow concentrations were 12 ± 7 µg/L. Overall total copper removal from influent water was 73 ± 14%. Although inflow water was toxic to C. dubia, no toxicity was observed in outflow water after 1 month. Diagnostic measurements of wetland function (e.g., hydrosoil redox potential and sulfide formation) indicated that copper bioavailability was likely limited by copper precipitation as sulfidic minerals. This constructed wetland design was implemented at the U.S. Department of Energy's Savannah River Site to mitigate risks to receiving-water biota.